Skip to content
CCS Heating & Renewables

Services

Solar Panels
Battery Storage
Heat Pumps
Ground Source
Air Conditioning
Boilers
Underfloor Heating
EV Chargers
Hot Water

Company

Areas We Cover Grants & Funding Solar for Holiday Lets Referral Programme About Us Reviews Blog Contact
01209 596 002 Get a Free Quote
6 miles from our base

Air Source Heat Pump Installation in Hayle

MCS certified heat pump installers just 6 miles from Hayle. Claim up to £7,500 with the Boiler Upgrade Scheme.

Gas Safe Registered
MCS Certified
5.0/5 (14 reviews)
200+ Installations

Why Hayle Homeowners Are Switching to Heat Pumps

Heat Pumps in Hayle: Six Miles From Our Pool Office

Hayle is the historic industrial port and gateway to St Ives Bay, just six miles from CCS Heating & Renewables' Pool office. The TR27 postcode is one of our most active heat pump installation areas. Approximately 30% of Hayle properties are off-gas — concentrated in the Lelant Downs, Gwithian, and Loggans Moor rural fringes — making the addressable market for the £7,500 Boiler Upgrade Scheme grant substantial.

Where Heat Pumps Make the Strongest Case in Hayle

  • Lelant Downs, Gwithian & rural fringes: Off-grid detached properties, almost universally oil-heated. Switching to a heat pump with the £7,500 BUS grant typically delivers a net upfront cost of £4,500–£8,000 plus £600–£1,400/year in fuel savings. See our oil to heat pump guide.
  • Loggans & Penpol post-war estates: Cavity-walled semi-detached — among the smoothest retrofits we do. 8–10kW units typical, minimal radiator upgrades.
  • Foundry & Copperhouse heritage cottages: Solid stone construction. Conservation area and Cornish Mining World Heritage Site sensitivity. We typically specify 9–11kW units with careful outdoor unit positioning.
  • Foundry regeneration new-build housing: Already heat-pump-ready under Cornwall Council Climate Emergency DPD requirements. Commissioning, MCS certification, and aftercare provided.
  • Riviere Towans coastal premium: Larger detached homes facing St Ives Bay. 12–16kW Daikin Altherma or Mitsubishi Ecodan systems. Net cost after BUS grant: £8,000–£12,000.

Costs After the £7,500 BUS Grant

Typical net costs in Hayle after deducting the Boiler Upgrade Scheme: £4,000–£6,000 for a Foundry cottage; £5,500–£7,500 for a Loggans semi; £6,500–£10,000 for a Riviere Towans coastal home or Lelant Downs rural detached. Running costs versus gas are roughly comparable when COP averages 3.5+. Versus oil — the rural situation — savings are £600–£1,400/year.

Cornish Mining World Heritage Site & Conservation Area

Parts of Hayle (Foundry, Copperhouse, Phillack) fall within the Cornish Mining World Heritage Site and a substantial conservation area. CCS Heating & Renewables prepares listed building consent applications and conservation area consent applications, positioning outdoor units sympathetically — typically rear courtyards or side returns where they are not visible from the street.

Pair with Solar & Battery

Combining a heat pump with solar PV and battery storage in Hayle creates an exceptionally strong financial case — particularly for the off-grid rural properties at Lelant Downs and Gwithian where oil prices are volatile. See our combined solar and heat pump guide and BUS grant explainer.

Areas covered: Serving Hayle town centre, Foundry, Copperhouse, Phillack, Loggans, Penpol, Riviere Towans, Lelant, Lelant Downs, Gwithian, and the wider TR27 catchment • Postcodes: TR27

9,000

Population

1295

kWh/m²/year solar

30%

Off gas grid

6 miles

From our base

Key local industries

Retail (Sainsbury's)Tourism (Towans Beach)Light industryHeritage (Harvey's Foundry)

As well as heat pumps, we also provide other energy services in Hayle:

Cornwall-wide renewable energy guides:

Our Process

How It Works

01
Step 1

Free Survey

We visit your Hayle property to assess your needs, measure heat loss, and discuss the best options.

02
Step 2

Design & Quote

We design a bespoke system, identify all eligible grants including the £7,500 BUS scheme, and provide a transparent fixed-price quote.

03
Step 3

Installation

Our MCS certified engineers install your system cleanly and efficiently, typically within 2–4 days, with minimal disruption to your home.

04
Step 4

Aftercare

Full system handover, MCS certification, warranty registration, BUS grant application completion, and ongoing support when you need it.

Book Your Free Survey No obligation · Free survey · MCS certified

Customer Reviews

What Our Customers Say

Google
"CCS installed our air source heat pump and the whole process was brilliant from start to finish. They handled the BUS grant application, and our heating bills have dropped significantly. The house is warmer than it ever was with our old oil boiler."
J&

James & Sarah T.

St Austell

Google
"We were nervous about switching from oil to a heat pump in our period cottage, but CCS made the whole process straightforward. The heat pump is quiet, efficient, and our oil delivery days are over. Brilliant job."
M&

Mark & Louise R.

Fowey

Google
"After much research we chose CCS for our heat pump installation and we are so glad we did. They took the time to explain everything, handled the grant paperwork, and the installation was completed in three days. Very professional team."
MH

Margaret H.

Par

Available for surveys this week

Get Started Today

Ready to Get Started in Hayle?

Get a free, no-obligation survey for your Hayle property. Our MCS certified engineers are ready to help.

Same-week survey

Fast turnaround

No pushy sales

Honest advice only

All grants handled

We do the paperwork

Quick Enquiry

2hr response

We'll get back to you within 2 hours during business hours.

Free survey
No obligation
MCS certified

Free 2026 Guide

Is your home ready for a heat pump or solar panels?

Get our free guide — costs, grants, and exactly what to expect.